Full Accreditation IWCF/IADC Well Control Training Center in Bangkok
Thailand Malaysia/Indonesia/Vietnam/Singapore/Australia
Sararit working at first drilling mud lab in Thailand
IWCf Kuala Lumpur, IWCF Malaysia, 28 - 01/05/08 IWCF Well Intervention Pressure Control Well Intervention, BLUE SKY HOTEL, BALIKPAPAN (IO 624) , 05 - 09/05/08 IWCF Well Intervention Pressure Control Well
Intervention, Quality Hotel Singapore (SG 590) , 05 - 09/05/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 12 - 16/05/08 IWCF Well Intervention Pressure Control Well Intervention Hotel Papandayan
Bandung, Indonesia (IO 554) , 19 - 23/05/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 19 - 23/05/08 IADC WellCAP Well Control BANGKOK, THAILAND , 26 - 30/05/08 IWCF Drilling Well Control
Sertifiserings liste boring 2007 (PTTCo, Saville Park Suites, Perth, Australia) , 02 - 06/06/08 IWCF Well Intervention Pressure Control Well Intervention Bangkok 2007 (TH 591) , 09 - 13/06/08 IWCF Well Intervention Pressure
Control Well Intervention, LABUAN, MALAYSIA (MA 628) , 09 - 13/06/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 (PTTCo, Grand Kemang Hotel, Jakarta) - IO627 , 16 - 20/06/08 IWCF Drilling Well Control
Sertifiserings liste boring 2006 Bangkok , 23 - 27/06/08 IADC WellCAP Well Control BANGKOK, THAILAND , 07 - 11/07/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 14 - 18/07/08 IWCF Drilling
Well Control Sertifiserings liste boring 2007 (PTTCo, Vung Tau, Vietnam) - VN617 , 14 - 18/07/08 IADC WellCAP Well Control BANGKOK, THAILAND , 21 - 25/07/08 IWCF Drilling Well Control Sertifiserings liste boring 2006
Bangkok , 28 - 01/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 (PTTCo, Grand Kemang Hotel, Jakarta) - IO627 , 04 - 08/08/08 IWCF Well Intervention Pressure Control Well Intervention Bangkok 2007 (TH
591) , 11 - 13/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Jakarta (IO 625) INDONESIA , 11 - 15/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 12 - 16/08/08 IWCF Well
Intervention Pressure Control Well Intervention Hotel Papandayan Bandung, Indonesia (IO 554) , 18 - 22/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 25 - 29/08/08 IWCF Drilling Well Control
Sertifiserings liste boring 2008 (PTTCo, Grand Kemang Hotel, Jakarta) - IO627 , 25 - 29/08/08 IADC WellCAP Well Control BANGKOK, THAILAND , 08 - 12/09/08 IADC WellCAP Well Control VUNGTAU, VIETNAM , 15 -
19/09/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 22 - 26/09/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 29 - 03/10/08 IADC WellCAP Well Control BANGKOK,
THAILAND , 06 - 10/10/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 06 - 10/10/08 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 13 - 17/10/08 IADC WellCAP Well Control
KUALALUMPUR, MALAYSIA , 20 - 22/10/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Jakarta (IO 625) INDONESIA , 20 - 24/10/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 03 -
06/11/08 IWCF Well Intervention Pressure Control Well Intervention PTTCO, Terengganu, Malaysia (MA 576) , 03 - 07/11/08 IADC WellCAP Well Control BANGKOK, THAILAND , 10 - 13/11/08 IWCF Well Intervention
Pressure Control Well Intervention PTTCO, Terengganu, Malaysia (MA 576) , 10 - 14/11/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 17 - 21/11/08 IWCF Drilling Well Control Sertifiserings liste boring
2006 Bangkok , 24 - 28/11/08 IWCF Well Intervention Pressure Control Well Intervention (PTTCo Bali, Indonesia, IO 592) , 08 - 12/12/08 IWCF Drilling Well Control Sertifiserings liste boring 2007 (PTTCo, Saville Park Suites,
Perth, Australia) , 15 - 19/12/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 15 - 19/12/08 IADC WellCAP Well Control BANGKOK, THAILAND , 22 - 26/12/08 IWCF Well Intervention Pressure Control
Well Intervention (PTTCo Bali, Indonesia, IO 592) , 22 - 26/12/08 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 15 - 09/01/09 IADC WellCAP Well Control BANGKOK, THAILAND , 19 - 23/01/09 IWCF
Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 26 - 30/01/09 IWCF Drilling Well Control PTTCO, NAVAMIN, BANGKOK, TH591 , 26 - 30/01/09 IWCF Drilling Well Control PTTCO, BUNDUNG,
INDONESIA (IO561) , 26 - 30/01/09 IADC WellCAP Well Control BANGKOK, THAILAND , 02 - 06/02/09 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH609) , 09 - 12/02/09 IWCF Well Intervention
Pressure Control PTTCO,BP JAKARTA, INDONESIA NOT Grand Kemang Hotel ANYMORE (IO627) , 16 - 19/02/09 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO625) , 16 - 20/02/09
IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 16 - 20/02/09 IADC WellCAP Well Control BANGKOK, THAILAND , 23 - 27/02/09 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD
HOTEL, TH548 (REV 1) , 23 - 27/02/09 IADC WellCAP Well Control JOHOR BAHRU, MALAYSIA , 02 - 06/03/09 IWCF Drilling Well Control PTTCO, VUNG TAU, VIETNAM (VN617) , 09 - 13/03/09 IWCF Drilling Well
Control PTTCO, BUNDUNG, INDONESIA (IO561) , 09 - 13/03/09 IADC WellCAP Well Control BANGKOK, THAILAND , 09 - 16/03/09 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO
625) , 16 - 20/03/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 16 - 20/03/09 IADC WellCAP Well Control BANGKOK, THAILAND , 23 - 27/03/09 IWCF Drilling Well Control PTTCO, THE
EMERALD HOTEL, TH548 , 23 - 27/03/09 IADC WellCAP Well Control BANGKOK, THAILAND , 06 - 10/04/09 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 (REV2) , 06 - 10/04/09
IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 13 - 20/04/09 IWCF Well Intervention Pressure Control PTTCO, HALLIBURTON OFFICE, JAKARTA, INDONESIA (REV 2) , 20 - 24/04/09 IWCF Drilling
Well Control PTTCO, THE EMERALD HOTEL, TH548 , 20 - 24/04/09 IADC WellCAP Well Control BANGKOK, THAILAND , 27 - 30/04/09 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 04 - 08/05/09
IWCF Drilling Well Control PTTCO, BALI, INDONESIA (IO592) (REV 1) , 11 - 12/05/09 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO 625) , 11 - 15/05/09 IWCF Well Intervention
Pressure Control PTTCO, THE EMERALD HOTEL, TH548 , 11 - 15/05/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 11 - 15/05/09 IADC WellCAP Well Control BANGKOK, THAILAND , 18 -
22/05/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 (REV 1) , 25 - 26/05/09 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO 625) (REV 1) , 25 - 29/05/09 IWCF
Drilling Well Control PTTCO, AMARI ORCHID RESORT & TOWER, PATTAYA, THAILAND (TH609) (REV 2) , 25 - 29/05/09 IADC WellCAP Well Control PATTAYA,THAILAND , 01 - 05/06/09 IWCF Well Intervention
Pressure Control PTTCO, THE EMERALD HOTEL, TH548 , 01 - 05/06/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 08 - 11/06/09 IWCF Well Intervention Pressure Control PTTCO, Kuala Lumpur,
Malaysia (MA 660) , 08 - 12/06/09 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 15 - 19/06/09 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 , 15 - 19/06/09 IWCF
Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 (REV 2) , 15 - 19/06/09 IADC WellCAP Well Control BANGKOK, THAILAND , 22 - 26/06/09 IWCF Well Intervention Pressure Control PTTCO, Grand Kemang
Hotel, Jakarta, Indonesia (IO668) (REV 2) , 22 - 26/06/09 IADC WellCAP Well Control BANGKOK, THAILAND , 06 - 10/07/09 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH 609) , 13 - 17/07/09 IWCF
Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 13 - 17/07/09 IWCF Well Intervention Pressure Control _PTTCO, Kuala Lumpur, Malaysia (MA 660) , 13 - 17/07/09
IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia (MA 660) , 13 - 17/07/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 13 - 17/07/09 IADC WellCAP Well
Control KUALALUMPUR, MALAYSIA , 20 - 24/07/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 20 - 24/07/09 IADC WellCAP Well Control BANGKOK, THAILAND
, 27 - 31/07/09 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH 609) , 27 - 31/07/09 IADC WellCAP Well Control PATTAYA,THAILAND , 03 - 07/08/09 IWCF Well Intervention Pressure Control PTTCO, THE
EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 03 - 07/08/09 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 03 - 07/08/09 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA,
INDONESIA (IO 625) , 10 - 14/08/09 IWCF Well Intervention Pressure Control PTTCO, BALI, INDONESIA (IO 592) (REV 1) , 10 - 14/08/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK,
THAILAND (TH 548) (REV 1) , 10 - 14/08/09 IADC WellCAP Well Control BANGKOK, THAILAND , 17 - 21/08/09 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH
548) , 17 - 21/08/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 17 - 21/08/09 IADC WellCAP Well Control BANGKOK, THAILAND , 24 - 28/08/09 IWCF Drilling Well
Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 31 - 04/09/09 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH 609) , 31 - 04/09/09 IADC WellCAP Well Control PATTAYA,THAILAND , 07 - 11/09/09
IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , Well Control Kuala Lumpur, Well Control KL, Well Control Malaysia, 07 - 11/09/09 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 14 -
18/09/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 14 - 18/09/09 IADC WellCAP Well Control BANGKOK, THAILAND , 21 - 25/09/09 IWCF Drilling Well Control
PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 25 - 29/09/09 IWCF Well Intervention Pressure Control Opi Building, Jakarta, Indonesia , 28 - 05/10/09 IWCF Drilling Well Control PTTCO, KUALA
LUMPUR, MALAYSIA , 05 - 09/10/09 IWCF Well Intervention Pressure Control PTTCO, KOTA KINABALU, MALAYSIA , 05 - 09/10/09 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 12 - 13/10/09 IWCF
Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) (REV 1) , 12 - 13/10/09 IADC WellCAP Well Control BANGKOK, THAILAND , 12 - 16/10/09 IWCF Well Intervention Pressure
Control PTTCO, BALI, INDONESIA (IO 592) (REV 1) , 12 - 16/10/09 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 12 - 16/10/09 IADC WellCAP Well Control
BANGKOK, THAILAND , 19 - 23/10/09 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 26 - 30/10/09 IWCF Well Intervention Pressure Control Pttco,Opi
Building, Jakarta, Indonesia , 26 - 30/10/09 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH 609) , 26 - 30/10/09 IADC WellCAP Well Control PATTAYA, THAILAND (TH 609) , 29 - 03/11/09 IWCF Well
Intervention Pressure Control Bali, Indonesia , 02 - 06/11/09 IWCF Well Intervention Pressure Control Kuala Lumpur, Malaysia , 02 - 06/11/09 IWCF Drilling Well Control Kuala Lumpur, Malaysia , 02 - 06/11/09 IADC WellCAP
Well Control Kuala Lumpur, Malaysia , 09 - 13/11/09 IWCF Well Intervention Pressure Control Bali Indonesia , 09 - 13/11/09 IWCF Drilling Well Control Bangkok, Thailand , 09 - 13/11/09 IADC WellCAP Well Control Bangkok,
Thailand , 15 - 19/11/09 IWCF Well Intervention Pressure Control PTTCO, LTD.,KOTA KINABALU, MALAYSIA , 16 - 20/11/09 IADC WellCAP Well Control BANGKOK, THAILAND , 22 - 26/11/09 IWCF Well Intervention
Pressure Control Opi Building, Jakarta, Indonesia , 22 - 26/11/09 IWCF Well Intervention Pressure Control Kuala Lumpur, Malaysia , 22 - 26/11/09 IWCF Drilling Well Control Kuala Lumpur, Malaysia , 30 - 04/12/09 IWCF Drilling
Well Control Pattaya, Thailand , 30 - 04/12/09 IADC WellCAP Well Control Bangkok, Thailand , 07 - 11/12/09 IWCF Well Intervention Pressure Control Bali Indonesia , 07 - 11/12/09 IWCF Drilling Well Control Kuala Lumpur,
Malaysia , 07 - 11/12/09 IADC WellCAP Well Control Kuala Lumpur, Malaysia , 14 - 18/12/09 IWCF Drilling Well Control Bangkok, Thailand , 14 - 18/12/09 IADC WellCAP Well Control Bangkok, Thailand , 21 - 25/12/09 IWCF
Well Intervention Pressure Control Bangkok Thailand , 21 - 25/12/09 IWCF Drilling Well Control Bangkok, Thailand. IWCf Kuala Lumpur, IWCF Malaysia, IWCF Singapore, IWCF Jakarta, IWCF Indonesia, IWCF Vietnam, IWCF
Australia, IWCF Perth, Well Control Bangkok, Well Control Australia, Well Intervention Thailand, Well Intervention Perth, Well Intervention Jakarata, Well Intervention Well Control, Well Intervention Kuala Lumpur, Well
Intervention Indonesia, Well Intervention Bangkok, Well Control Training, IWCF Well Control School, Well Control Kuala Lumpur, Well Control KL, Well Control Malaysia, IWCF KL, Well Control Vietnam, Well Control
Singapore, Well Control Jakarta, Well Control Indonesia, Well Control Thailand, Well Control Perth, Well Intervention Australia, Well Control Courses, IWCF Training, Well Control School, Well Intervention Bangkok, Well
Intervention Malaysia, Well Intervention Vietnam, Well Intervention Indonesia, Well Intervention Singapore, IWCF/IADC Well Control Training, IWCF/IADC Coil Tubing, IWCF/IADC Snubbing, IWCF/IADC/  Wireline,
IWCF/IADC Well Completion, IWCF/IADC Drilling/Workover, Coil Tubing Well Control, Snubbing Well Control, Wire Line Well Control, Work Over Well Control, Drilling Well Control, IWCF Training Courses, IWCF/IADC
Well Control in Kuala Lumpur Malaysia, Jakarta Indonesia, Singapore, Hochiminh HCM City Vietnam. Combined surface/subsea, Driller/Fundamental/Supervisor at KL Malaysia Bali Bandung Balikpapan Indonesia, Vung Tau
Vietnam, Perth Australia, and Brunei. IWCF/IADC Well Control Malaysia/Indonesia/Vietnam/Singapore/Australia.  Level1 Wireline & Coiled Tubing Operations, Level1 Wireline & Snubbing Operations,
Level1 Coiled Tubing Operations, Level1 Coiled Tubing Operations & Snubbing Operations, Level1 Snubbing Operations, Level1 Combined Operations, Level2 Wireline Operations, Level2 Wireline & Coiled Tubing Operations,
Level2 Wireline & Snubbing Operations, Level2 Coiled Tubing Operations, Level2 Coiled Tubing Operations & Snubbing Operations, Level2 Snubbing Operations, Level2 Combined Operations, Surface, Driller, Drilling, Surface,
Supervisor, Drilling, PTTCO Basic Well Control, Combined Surface & Subsea, Driller, Drilling, Combined Surface & Subsea, Supervisor, Drilling , Surface, Fundamental, Drilling, Surface, Supervisor, Drilling, Combined Surface &
Subsea, Fundamental, Drilling, Combined Surface & Subsea, Supervisor, Drilling.



PTTCO operates under full accreditation of IWCF Well Control
and IADC WellCAP Certification Programs at Driller (Fundamental), and Supervisor level
for both surface and subsea BOP stack. We arrange frequent training program
school in drilling, well servicing, well intervention, workover, completion,
wireline, snubbing, coil tubing, IWCF/IADC combined surface and subsea BOP stack,
accredited blow out prevention (BOP Course),
at our training centers in Malaysia, Indonesia, Thailand.

Who should attend ?

He/She acquires the required competency from IADC/IWCF,
Drilling Representatives, Drilling Superintendent,  Drilling Supervisors,
Tool Pusher, Tour Pusher, Driller, Assistant Driller, Well Construction Engineer,
Mud Engineer, Rig Manager, Safety Officer for Drilling Rig, Chief Mechanic of Drilling Rig,
Chief Electrician of Drilling Rig, Material Man for Drilling Rig,
Instrument Engineer for Drilling Rig,
Well Services Operator/Technician, who desire IWCF/IADC certification and for those
who want a thorough knowledge of well control techniques and drilling safety, etc.

Duration 5 days

Course Overview: Basic introductory principles and theory of well control along with the most
commonly used well control techniques. IWCF/IADC Certification is awarded upon successful
completion at Supervisor or Driller level for surface and subsea BOP stack.

Course Outline/Content:

Well control Principle and Procedure (P&P) and Blow out Preventer Equipment (BOPE) Basic
terms, BHP, Leak Off test, Kick Indications, Shut-In Procedures, Well Killing Methods, Problem
During Circulating out Kick, IWCF/IADC written test and Drilling/Workover Well Control
Simulator Training/Practice/Assessment, Well Control Written Test.


Bangkok Office

PTTCO LTD.

54/3 Moo 13, Navamin 70
Buengkum, Bangkok 10240, Thailand
Tel: +662 947 8259
Fax: +662 510 3808, +662 510 6195
E-mail: info@pttco.org
www.pttco.org
Bangkok Training Location

THE EMERALD HOTEL
99/1 Ratchadapisek Road, Din Daeng, Bangkok 10400
Thailand. Tel. + 66 (2) 2764567 Fax + 66 (2) 276 4555-6
www.emeraldhotel.com



Pattaya Training Location

HOTEL J PATTAYA

221 Moo 6, North Pattaya, Pattaya City Chonburi 20150
Thailand

Tel: +66 (0) 3842 3620 – 1, +66 (0) 3842 3730 Fax: +66
3842 3731
E-mail: info@hoteljpattaya.com
www.hoteljpattaya.com
Kuala Lumpur Training Location

HOTEL ISTANA KUALA LUMPUR

73, Jalan Raja Chulan
50200 Kuala Lumpur, Malaysia
T : +603.2141.9988 F : +603.2144.0111
E : general@hotelistana.com.my
www.hotelistana.com.my
Lex Lim "Basic competency in
well control is important in
the oil and gas industry to
prevent blowouts and
mitigate well control problems"